I'm not a great photoblogger, so instead of showing multiple steps from start to finish, I just did a before and now an after on the master bathroom. Sorry!
This room has been a work in progress for at least 5 months, no joke. Most of the reason it took so long is because I only worked on it on Saturdays and then got tired and stopped. However, now that I have more time to work on home projects, this was the first room to tackle.
Here are the steps I took to finish this almost never-ending project...
BG
Friday, January 31, 2014
Something I should have posted a while ago...
Thursday, January 23, 2014
Master bath | Part One of ?
I'm finally starting to work on some lingering house projects - first up, the master bathroom. This room had wallpaper (surprise), and like the kitchen, some parts were glued right to the dry wall.
I did a mix of removing wallpaper where water would get (near tub, shower, sinks), but decided to paint right over some of the other places, mostly out of laziness.
What a beautiful border! *sarcasm font*
I did a mix of removing wallpaper where water would get (near tub, shower, sinks), but decided to paint right over some of the other places, mostly out of laziness.
Subscribe to:
Posts (Atom)