Friday, March 14, 2014

Brand new shoes!

Well, not those kind of shoes... the molding type of shoe! Exciting, right? Right?!

Anyways, I am thrilled to finally start the process of adding finishing molding to our baseboards. Ever since we had our floors done (last May!) they've looked unfinished because there wasn't any quarter round or shoe molding. Most people probably wouldn't notice, but anywhere I look, I see too much space below the baseboards and it is starting to really bother me.

Thursday, February 20, 2014

White box update

In our master bathroom, we have a separate, small room for our toilet. Before I made any updates, it was basically a white box.

After I had painted the main bathroom area, I decided to go ahead and tackle the toilet area as well. But, I wanted a slightly different, maybe more fun color. I chose Dancing Mist from Valspar - you can see the bathroom and toilet area paint colors together below. The master bath color is less gray in person, so they work really well together.

Monday, February 17, 2014

It's the little things...

Today, I decided to do a small update that I feel has a lot of impact on the outside of our home.

Our outdoor lighting fixtures were a mixed bag of rusty, faded brass...


...and a weird pinky bronze finish that got lost in our brick...

Friday, February 7, 2014

Upstairs construction

The title of this post is a little misleading. However, I did use a miter box, saw, drill, screws, wall anchors, a level, liquid nails, a hammer, and finishing nails - I consider that a construction project!

Upstairs we have a lot of built ins. There are two that caddy corner in the far corner of the room. The problem was that there was a hole (down to the floor) where the built ins met. Paul (one of our cats) loves to climb and regulary jumps onto the shelves, and has started to investigate the hole! I can't imagine the chaos that would ensue if he got stuck down there.

So, construction project!

Friday, January 31, 2014

Master bath | DONE!

I'm not a great photoblogger, so instead of showing multiple steps from start to finish, I just did a before and now an after on the master bathroom. Sorry!

This room has been a work in progress for at least 5 months, no joke. Most of the reason it took so long is because I only worked on it on Saturdays and then got tired and stopped. However, now that I have more time to work on home projects, this was the first room to tackle.

Here are the steps I took to finish this almost never-ending project...

Something I should have posted a while ago...

We made a major update to our home in December. The exterior trim needed to be updated - it was blue, peeling, needed repair, etc. Here are two before pictures...


Thursday, January 23, 2014

Master bath | Part One of ?

I'm finally starting to work on some lingering house projects - first up, the master bathroom. This room had wallpaper (surprise), and like the kitchen, some parts were glued right to the dry wall.


What a beautiful border! *sarcasm font*

I did a mix of removing wallpaper where water would get (near tub, shower, sinks), but decided to paint right over some of the other places, mostly out of laziness.